Tyco Water Home | Products | Product News | Project News | Export | TFC Pacific

Search 

 
Ductile Iron Pipelines Sintakote Steel Pipelines Plastic Pipeline Systems Pipeline Components Services Contact Us
Services : Complete Tapping Service : AquaStop : Excavation Requirements

 

AquaStop
The Complete inline "Stop-Off" solution

Excavation Requirements 

Notes on Trench Dimensions

1. The excavation must give 100mm clearance below the bottom of the pipe.

2. All statutory requirements regarding trenching and confined space need to be complied with.

3. Other services may be in the excavation area provided they are not on the same elevation
    as the pipe to be tapped.

4. These are the minimum requirements and if obstructions prevent an excavation of this
    size please contact us as we may be able to work around them.

AquaStop Excavation - Depth Min 600mm x Width Min 1500mm

Minimum Excavation
1500mm Width x 600mm Depth

Contact Us     Operation     Uses and Advantages     Technical Specifications

                                                       Login/outInternational Links | Disclaimer | Privacy & Collection | Web Master